+30% Production throughput, no capital spend for a UK cereal manufacturer

The Challenge

A coating line was the constraint on a high-demand cereal. Demand exceeded maximum capacity, and internal and external specialists around the world had not been able to move it.

What we did

Diagnosed the line from first principles and isolated four separate bottlenecks, then fixed each one.

The Result

Maximum infeed rate rose from 50 to 65 kg/min, a 30% gain. The extra capacity went directly into increased production capability and sales.

Ready to see what we can do for you?

Are you limited by how much you can produce? You may not need to spend big to get big results. Get in touch to book a production assessment and find out where your next biggest win is hiding.

Next
Next

+600 kg/hour from existing extruders